If you are a Civil engineer, you need to know...



RCC work :-

1)Minimum no of bars For square column or rectangular = 4 bars

2)Minimum no of bar For circular column = 6 bars

3)Standard sand in india is obtained from Ennore

4)1 Yard = 3 feet

5)Weight of steel bar= D2/162.2 kg/m

6)Weight of steel = D2/533 kg / ft

7)Slope of staircase =  25degree to 40 degree

8)Size of concrete testing cube =  150x150x150 mm

9)Concrete cube is filled in =  3 layers

10)Slump cone is filled in =  4 layers

11)Cement should be used within three months of manufacturing.

12)Minimum thickness of shear wall =  150mm

13)Maximum thickness of shear wall  = 400mm

14)Universal testing machine is used for compression test of concrete tensile test of steel reinforcement.

15)Minimum curing period

7 Days Normal weather condition

10 Days not weather condition

16)Minimum percentage of steel column  = 0.08 % of cross area

17)Max % of steel in column  = 6% of gross area

18)Nominal Cover

  Footing  = 50mm

  Column  = 25-40mm

  Slab       = 15-20mm

  Beam     = 25mm

19)Lapping is not allowed in bars of diameter 36mm or more welding is preffesed.

20)No.of stirrups in beam = clear span/c/c/ spacing + 1

22)R.C.C is affected by water because of corrossion of reinforcement bars.

23)P.C.C is not affected by the water.

24)Height of Parapet wall should be = 1m

25)Thickness of DPC = 2.5cm OR 1 inch

26)Height of Building Floor = 3.15m

27)Height of Window = 2.1m

28)One bag of cement  = 1.25cubic feet and 0.0347 m3

28)Weight of one cement bag = 50kg

29)Minimum thickness of slab =  110mm

30)No.of cement bags in 1m3  = 28.8bags

31)Lintel thickness  = 15cm (min)

32)Lintel is provided at  = 2.4 m in case of Brick wall

33)Minimum diameter of bars used in slab  = 8mm

34)Minimum diameter of bars used in column = 12mm

35)Minimum diameter of bars in Dowel bars = 12mm

36)Maximum diameter of bars in slab =  1/8 x thickness of slab

37)Maximum chair spacing =  1m

38)Dimensional tolerance of cube =  +2mm -2mm

39)Maximum water absorption of first class brick =  15% of  dry Weight.

40)Initial setting time of cement =  30 minutes.

41)Final  setting time of cement  = 10 hrs (600 minutes)

42)DPR = Detailed project report.


Unit Weight:-

1) RCC = 25 kn/m3  = 25000N/m3

2) PCC  = 24 kn / m3    = 24000 N/m3

3) Steel = 7850 kg/m3

4) 1 Gallon  = 3.78 liters